Production-block:
Boeing B-17E: 41-2393 to 41-2669
Manufacturer:
Boeing
- Bomb Group:
- 34th Bomb Group
- 7th Bomb Group
- 88th Bomb Group
- Bomb Squadron:
- 317th Bomb Squadron
History of
B-17 41-2547 / Per Diem
Delivered Pendleton 5/2/42; 34BG Tucson 14/5/42; Rapid City 5/12/42; Assigned 317BS/88BG Walla Walla 14/1/43; in base landing accident with Joe Bambrough 27/1/43; rep. Lockbourn 9/4/43. Reconstruction Finance Corporation (sold for scrap metal in USA) Albuquerque 14/7/45. (Served with 7BG Asanol, India, April 1942?) PER DIEM.
Last updated: 10. February 2018
Write comment