Production-block:
Boeing B-17E: 41-2393 to 41-2669
Manufacturer:
Boeing
- Bomb Group:
- 96th Bomb Group
- 97th Bomb Group
History of
B-17 41-2580
Delivered MacDill 14/2/42; 97BG Sarasota 29/3/42; Bangor 26/6/42; Muroc 11/8/42; Walla Walla 5/9/42; 96BG Pocatello 6/11/42; Gowen 15/2/43; with Paul Dorny force landed Corrine, UT 17/3/43; Hill 20/3/43; Lockbourn 23/6/43; with Harry Saftler 30/3/44; Reconstruction Finance Corporation (sold for scrap metal in USA) Altus 9/10/45.
Last updated: 12. March 2022
Write comment