Production-block:
B-17F-85-BO: 42-30032 to 42-30131
Manufacturer:
Boeing
- Bomb Group:
- 97th Bomb Group
History of
B-17 42-30102
Delivered Cheyenne 10/4/43; Smoky Hill 29/5/43; Morrison 8/6/43; Assigned 97BG Chateau-du-Rhumel 16/6/43; Pont-du-Fahs 1/8/43; Depienne 15/8/43; Cerignola 20/12/43; Amendola 16/1/44; weather ship from 15/7/44; Salvaged 30/3/45.
Last updated: 31. December 2018
Write comment