Production-block:
B-17G-30-BO 42-31732 to 42-31931
Manufacturer:
Boeing
- Bomb Group:
- 388th Bomb Group
- Bomb Squadron:
- 563rd Bomb Squadron
Missions: 36
History of
B-17 42-31769 / Cock of the Walk
Delivered Cheyenne 12/12/43; Gr Island 22/12/43; Assigned 563BS/388BG [D] Knettishall 19/2/44; after 36 mission transferred 15AF 6/9/44; Salvaged 6/11/45. COCK OF THE WALK.
Last updated: 19. October 2018
Write comment