Production-block:
B-17G-30-BO 42-31732 to 42-31931
Manufacturer:
Boeing
- Bomb Group:
- 301st Bomb Group
- Bomb Squadron:
- 352nd Bomb Squadron
History of
B-17 42-31839
Delivered Denver 25/12/43; Charlotte 11/1/44; Savannah 12/1/44; Morrison 24/1/44; Assigned 352BS/301BG Cerignola 26/1/44; Lucera 1/2/44; battle damaged Milan 30/4/44; re-ass weather ship 12/10/44; transferred depot 3/4/45; Salvaged 14/6/45.
Last updated: 1. March 2018
Write comment