Production-block:
B-17G-1-VE: 42-39758 to 42-39857
Manufacturer:
Lockheed/Vega
- Bomb Group:
- 25th Bomb Group
- Bomb Squadron:
- 652nd Bomb Squadron
History of
B-17 42-39777 / Stumble Butt
Delivered Long Beach 28/8/43; Scott 29/9/43; Assigned 625BS/25BG Watton 802 Recon Group, 7/10/43, but re-assigned from 1 SAD Lt Staughton, Sfk. as a weather ship; sal after overshut runway at Watton, with ? no crew named; Salvaged 3SAD 17/9/44. STUMBLE BUTT.
Last updated: 3. December 2018
Write comment