Production-block:
B-17G-55-DL: 44-6501 to 44-6625
Manufacturer:
Douglas
- Bomb Group:
- 306th Bomb Group
- 381st Bomb Group
- 398th Bomb Group
History of
B-17 44-6515
Delivered Lincoln 26/8/44; Grenier 11/9/44; Assigned 357BS(?)/306BG Thurleigh 23/9/44; transferred 29 TAC 381BG Ridgewell 14/5/45; 398BG Nuthampstead 27/5/45; no ops, RAF Valley 2/6/45; Returned to the USA Bradley 7/6/45; Sth Plains 12/6/45; Reconstruction Finance Corporation (sold for scrap metal in USA) Kingman 1/12/45.
Last updated: 1. March 2018
Write comment