Production-block:
B-17G-60-DL: 44-6626 to 44-6750
Manufacturer:
Douglas
- Bomb Group:
- 2nd Bomb Group
- Bomb Squadron:
- 96th Bomb Squadron
History of
B-17 44-6627
Delivered Lincoln 2/10/44; Grenier 12/10/44; Assigned 96BS/2BG Amendola 19/10/44; engine trouble Bologna 16/4/45 with Woodrow Abbott; returned early with engine problems, then u/c collapsed; {45m} Salvaged 16/4/45.
Last updated: 23. August 2017
Write comment