Production-block:
B-17G-85-VE: 44-8801 to 44-8900
Manufacturer:
Lockheed/Vega
- Bomb Group:
- 100th Bomb Group
- 493rd Bomb Group
- Bomb Squadron:
- 351st Bomb Squadron
- RCL: EP-D
History of
B-17 44-8823
Delivered Cheyenne 7/1/45; Hunter 27/1/45; Grenier 3/2/45; Assigned as PFF 351BS/100BG [EP-D] Thorpe Abbotts 17/2/45; 493BG Debach ; Returned to the USA Morrison 10/10/45; Reconstruction Finance Corporation (sold for scrap metal in USA) Walnut Ridge 9/1/46.
Last updated: 6. January 2018
Write comment