Production-block:
B-17G-90-VE: 44-8901 to 44-9000
Manufacturer:
Lockheed/Vega
- Bomb Group:
- 303rd Bomb Group
- Bomb Squadron:
- 427th Bomb Squadron
History of
B-17 44-8924
Delivered Cheyenne 9/2/45; Hunter 3/3/45; Grenier 12/3/45; Assigned 427BS/303BG Molesworth 18/3/45; Returned to the USA Morrison 8/10/45; Reconstruction Finance Corporation (sold for scrap metal in USA) Walnut Ridge 21/12/45.
Last updated: 14. September 2017
Write comment