Production-block:
B-17F-35-BO: 42-5079 to 42-5149
Manufacturer:
Boeing
- Bomb Group:
- 301st Bomb Group
- Bomb Squadron:
- 419th Bomb Squadron
History of
B-17 42-5085
Delivered Denver 23/9/42; New Castle 7/10/42; Assigned 419BS/301BG Tafaraoui 7/11/42; Maison Blanche 5/12/42; Biskra 16/12/42; Ain M’Lila 17/1/43; St Donat 6/3/43; Oudna 6/8/43; Cerignola 7/12/43; Lucera 1/2/44; taxi acc {3m} Salvaged 31/12/45.
Last updated: 1. March 2018
Write comment