Production-block:
B-17F-30-VE: 42-5855 to 42-5904
Manufacturer:
Lockheed/Vega
- Bomb Group:
- 100th Bomb Group
- 499th Bomb Group
History of
B-17 42-5868
Delivered Long Beach 3/4/43; Assigned 100BG but transferred Dyersburg 16/4/43; Tinker 13/12/43; with Jim Bonner force landed Tinker 1/3/44; 499BG Smoky Hill 9/8/44; 233 BU Davis Monthan 15/8/44; 235 BU Biggs 3/1/45; Reconstruction Finance Corporation (sold for scrap metal in USA) Kingman 30/10/45.
Last updated: 3. September 2018
Write comment